Using Importance Measures of Risk Clusters to Assist Project Management

DSM 14 Proceedings of the 16th International DSM conference: Risk and Change management in complex systems

Year: 2014
Editor: Marle, F.; Jankovic, M.; Maurer, M.; Schmidt, D. M.; Lindemann, U.
Author: Fang, C.; Marle, F.
Series: DSM
Section: Clustering and Optimization
Page(s): 187-196

Abstract

In this paper, we present an innovative approach for measuring importance of project risks at a group level. First, a simulation-based risk network model is used to account for risk interactions during the project development. Various importance measures are then proposed to assess risks with respect to their influence on the global risk exposure. The originality is estimating the risk importance measures at the group level, formed using interactions-based clustering techniques. Serving as a powerful complement to the classical risk criticality analysis, the proposed method is able to support decision-making like risk response planning. An example of application to a large engineering project for implementing a tramway system is provided to illustrate the utility of the approach.

Keywords: Risk interaction, risk clustering, importance measures, design structure matrix, project management

Please sign in to your account

This site uses cookies and other tracking technologies to assist with navigation and your ability to provide feedback, analyse your use of our products and services, assist with our promotional and marketing efforts, and provide content from third parties. Privacy Policy.